Enbridge Inc.
Spacer
Spacer
Top Navigation
Spacer

Liquids Pipelines


 

Enbridge Pipelines
Edmonton Control Centre
Mainline expansion during the 1990s
Tank at Regina Terminal
Pipeline construction in the 1950s
Enbridge Athabasca
Construction in Northern Alberta 1998/1999
Construction in Northern Alberta 1998/1999
Field and Facilities
Employees opening valves release a scraper pig
Fitting pipe over internal welding unit
Loading inspection tool into pig trap
Pipes and valves at Sarnia Terminal
Pipe welding inside welding shack
Pipes and valves at Edmonton Terminal
Laying welded pipe in trench at Hardisty, Alberta
Tank at Regina Terminal
Tank at Edmonton Terminal
Tank construction nearly complete

   

^ top of page